Loading live production data from Google Sheets…

Vienovo Operation Excellence Command CenterProduction output · run rates · product mix · quality · materials · forecast & S&OP — all plants

OPERATIONS COMMAND CENTER —
to
OPERATION EXCELLENCE COMMAND CENTER
National feedmill operations intelligence · output · run rate · mix · quality · materials · S&OP — click any module to open it

Priority actions

⚡ BIGGEST MOVES
📐 Targets & Settings⟳ Refresh data⬇ Export Excel📄 Reports🤖 Action tracker

KPI tiles

Green = on target · amber = up to 7 % off · red = more than 7 % off (not attained) · ᵃ = no official target, so the target is the plant's own average · 🔥 = days in a row not attained · daily values from the MR daily report; OEE and coal from the weekly sheet; LTI from the safety workbook.

Not attained

KPI detail

daily trend vs target · all plants compared

Weekly matrix (classic view)

the 14-KPI × week grid from the VPI dashboard · click to expand

Failing KPIs — weekly matrix

Targets: Ken's KPI limits (management spec 24 May 2026, plant targets revised 30 May). ᵃ = no official target → the plant's own average of its weeks. Weekly values from the Weekly Operations sheet; daily output = average of production days; MCOS/t = average of the daily cost-by-form sheet.

Cell detail

weekly trend vs target · the plant's scorecard for that week

Failures by KPI

Failures by plant

red cells in the weeks shown

⚠ Consistently failing KPIs

red in ≥ 50 % of weeks or 3+ weeks in a row · judged over the weeks shown (running week excluded) · click a row to open it

KPI trend watch

Findings

✦ Smart analysisrule-based, quotes its numbers

Recommended actions

owner · evidence · add to tracker

Monthly output vs commitment & forecast

Plant performance

click a plant to focus · tolling plants marked

Output trend

Output by period

actual · plan · commitment · forecast · variance · attainment — click a row to drill into it

Plant × product line

MT · lines add up to total output

Plant × product form

MT · forms add up to Complete Feeds + Mash line

Plant run rate & capacity

gross vs net vs equipment · rated vs demonstrated vs actual

Run rate trend

Product-form run rate (TPH)

Product-form run rate by plant

MT/h = form volume ÷ form hours (Daily Cost-by-Form) · different forms have different achievable rates

Equipment · pellet-mill lines

output per line · run hours · bottleneck flag

OEE (weekly sheet)

Where the hours went

working hours → productive hours

Downtime by category & plant

hours — detail lives in the Reliability Command Center

Efficiency by plant

output per hour / day · change-overs · schedule adherence · capacity lost

Change-over trend

Product line mix

% of total output

Product form mix

% of Complete Feeds + Mash line

Form mix trend

Plant form mix

% of each plant's feed output · TPH beside it

Pack formats produced

Top feeds produced

Rejection rate trend

Process gain / loss trend

kept separate from rejects · band ±%

💧 Smart Moisture SKUs — gain / loss monitor

Production orders (newest first)

By plant

rejects (outright + other = remill) · gain/loss · value

Rejection register

Remill re-used in production

order log · remill components issued into new batches

Complaints by category

Complaint trend

Valid vs invalid

Status

Product form

Pick-up vs delivery

Customer type

Bags vs bulk

Corrective action

CCAR issued

By warehouse

valid · invalid · pending · plant code where the warehouse is a plant

Top products named

a complaint naming 2 products counts in both

Warehouse × category heat map

click a cell to filter both

Feed age at complaint

Workload by person assigned

closed · open · no status

Days to close

Delivery → complaint

Process compliance by regional manager

% of complaints with a corrective action · CCAR · evidence · click a manager to filter

Complaints by sales rep (filed by)

valid · invalid · pending

Complaints by regional manager

blank regional manager = direct manager

Findings

✦ Smart analysisrule-based, quotes its numbers

Recommended actions

Repeat customers

Open complaints watch-list

Complaint log

Plant × week — variance value

Weekly variance value by plant

Accumulated variance value by plant

Total variance % by plant

Σ variance ÷ Σ (beginning + received) · dashed = approval limits (MACRO 0.5%, LIQUID / GRAINS 0.3%, MICRO 0.2%) · weeks use the KPI sheet % (all categories)

RM variance by plant

MR sheet · − = over-usage

Monthly trend

net and absolute % of input

Component variance — planned vs issued

RM mass balance — formula → weigher → bagging, by month

Order log vs plant input & output — by month

Variance flags

data-integrity checks on the order log

Feed & formula selector

Run rate — this feed

Composition by nutrient group

% of batch input (issued)

Oils & liquids inclusion (kg/MT)

palm oil · molasses · coconut oil by month

Formula as practised

planned vs actual inclusion · kg/MT · variance · monthly drift — read-only; changes go through formulation approval

Formula exceptions & substitutions

components that appear/disappear by month or drift > 2 pts

Process & pellet quality

order level · live
Every completed production order from SBO Prod Output Monitoring: run rate, SOV, extraction, rejects, gain/loss and the pellet-mill readings (conditioning, moisture, hardness, fines, amperes). Uses the global period, site and form filters.

Weekly output · run rate · SOV

Hardness vs conditioning temperature

each dot = one pelleting order with both readings

    Process window by plant & form

    median and 10th–90th percentile · amber = median outside the guidance band

    Feeds — run rate, SOV and pellet quality

    top 30 by output

    People — run-rate index

    100 = median of the same plant + form + month (fair across products)

    Process data recorded

    share of pelleting orders with each reading filled

    Orders outside the process window

    Can we trust "issued vs planned"?

    share of order lines where issued = planned exactly — then the variance is not measured (issued copied from the plan)

    Macro liquids — kg per MT of feed

    issued ÷ finished-feed batch input · planned in brackets

    Monthly inclusion by plant

    Unusual consumption alerts

    month > ±20 % from the plant's own average

    Why did kg/MT change? — product mix vs formula

    Top macro materials

    Next-month requirement

    Top raw materials per plant

    MACRO · MICRO · OIL — MT issued and kg/MT
    📈 Daily
    Week

    Daily Output by Plant

    MT · per plant · red = below the plant daily target

    Daily Output — Stacked

    total · by plant

    Capacity Utilization %

    output ÷ demo capacity

    Unscheduled DT %

    daily UDT rate per plant

    Rejection Rate %

    remill ÷ output

    Energy — kWh / Ton

    daily efficiency

    Fuel — Liters / Ton

    daily fuel efficiency

    Daily Fuel Cost

    ₱ / day · by plant

    Form Mix — Period Total

    pellet · crumble · mash MT

    Daily MCOS / Ton

    ₱/MT per plant · MCOS ÷ MR daily output

    Mfg Cost ₱/MT by Form — Period Avg

    Variable vs Fixed Cost

    stacked · ₱ / day

    Form Share % — Period

    production mix by form

    Daily Detail Log

    DateWkPlantPlannedOutputPlan %Cap UtilUDT %Total DT %Run RateRej %kWh/TonLi/TonPelletCrumbleMash
    📈 KPI Trends — daily month · latest week · last 7 days, then each KPI day by day

    Capacity Util vs Plant Util %

    DAILY · two lines · target 85%

    OEE Trend

    DAILY · per plant

    Output (MT)

    DAILY trend · per-plant daily target

    Outright vs Other Rejects %

    DAILY · two lines

    Process Loss / Gain %

    DAILY · ±band

    Unscheduled DT per Category (hr)

    DAILY · Elec / Mech / PLC / Process

    MCOS Trend (₱/ton)

    DAILY · Daily Cost sheet MCOS/ton

    Fuel / Coal Consumption

    DAILY trend vs limit

    Power Consumption kWh/ton

    DAILY trend vs limit

    Plant RR vs Net RR (t/hr)

    DAILY · two lines + variance

    RM Variance %

    DAILY · gross · w/o sacks

    Safety — Safe Man-Hours & LTI

    DAILY · LTI target 0
    Command-center additions plan attainment heat map & exceptions (not in the VPI dashboard tab)

    Daily output vs plan

    Daily rejection & gain/loss

    Daily run rate & downtime %

    Plan attainment heat map

    plant × day · click a cell to open that day

    Daily exceptions

    days outside the thresholds in Settings, with the source numbers
    Weekly Pulse
    View week

    Scorecard

    Complete Feeds · cap util · OEE · UDT per plant

    Weekly KPI Summary

    period totals & averages

    Weekly Output MT

    all plants or selected site

    Weekly DT Rate %

    week by week

    Capacity Utilization %

    weekly trend by plant

    Run Rate t/hr

    self-operated plants

    Full Weekly KPI Detail — All Sites × All Metrics

    rows = KPIs · columns = weeks · scroll right

    Weekly Pull-Out Report

    📈 KPI Trends — weekly month · latest week · last 7 days, then each KPI week by week

    Capacity Util vs Plant Util %

    WEEKLY · two lines · target 85%

    OEE Trend

    WEEKLY · per plant

    Output (MT)

    WEEKLY trend · target = daily × 6

    Outright vs Other Rejects %

    WEEKLY · two lines

    Process Loss / Gain %

    WEEKLY · ±band

    Unscheduled DT per Category (hr)

    WEEKLY · Elec / Mech / PLC / Process

    MCOS Trend (₱/ton)

    WEEKLY · mfg cost per ton

    Fuel / Coal Consumption

    WEEKLY trend vs limit

    Power Consumption kWh/ton

    WEEKLY trend vs limit

    Plant RR vs Net RR (t/hr)

    WEEKLY · two lines + variance

    RM Variance %

    MONTHLY · gross · w/o sacks (source is monthly)

    Safety — Safe Man-Hours & LTI

    WEEKLY · LTI target 0
    Command-center additions ISO-week table, ranking & recurring exceptions (not in the VPI dashboard tab)

    Weekly KPI table

    Weekly output · per production day

    normalises for working days

    Weekly quality & run rate

    Top & bottom plant each week

    plan attainment · tolling excluded

    Recurring exceptions

    KPI failing in ≥ 3 of the last 4 complete weeks

    Performance Radar

    Self-operated · Normalized 0–10

    DT Rate Ranking

    Total DT% — lower is better

    Full Performance Summary — 2026

    PlantOutputCap UtilAvg UDTAvg DT%Net t/hrAvg Rej%kWh/ton₱/tonTotal ₱RM Var%Rating

    KPI Targets vs Actuals — Heat Map

    Per plant · vs revised 2026-05-30 targets · green within / amber near / red beyond
    Sales Forecast — Loading...

    Monthly Sales Forecast — by Area

    kg · Total Plant Output in MT · sales sheet

    Monthly Sales Forecast — by Warehouse

    Per-warehouse coverage & gap · region subtotals

    Weekly Pull-Out — by Area

    kg

    📦 Pull-Out by SKU — Region × Month

    SKU × volume (tons)
    Command-center additions — forecast accuracy, SKU forecast tracker and pack formats (not in the VPI dashboard tab).

    Forecast accuracy (production vs S&OP forecast)

    SKU forecast vs MTD pull-out

    from the regional SKU MTD sheets

    Pull-out by pack format & month

    MT · SKU pull-out sheet
    Sales & Operation Planning
    📋 Sales & Operation Planning
    Per-plant S&OP review · forecast vs commitment · highlights, issues & actions

    Output vs Forecast vs Commitment

    Capacity Utilization Rate

    vs Demo Capacity · %

    Detailed Performance Summary

    Full Metric Breakdown

    Site Utilization Ranking

    Rejection Breakdown

    Outright vs Other · %
    Monthly Highlights · Issues · Actions

    ✓ Highlights

    ! Issues

    ◎ Actions

    Executive S&OP Summary

    ✦ auto-composedauto-composed narrative · selected plant
    Command-center additions — month-end landing, scenario planner, region balance, allocation proposals and approval log (not in the VPI dashboard tab).

    Planning month & scenario

    a proposal, not a confirmed commitment

    Supply vs demand by plant

    Region balance

    plants in a region can cover each other

    Proposed allocation

    move shortfall to same-region plants with spare demonstrated capacity

    Forecast · commitment · actual by month

    Plan approval log

    saved in this browser (Phase 1)
    Capacity & Sales Alignment · live capacity simulator

    Live scenario controls

    what-if only · source data never changes

    Month-end expected volume projection

    MTD actual + projected remaining = expected month-end · red line = sales forecast

    Daily run-rate trend

    actual vs required vs selected achievable rate · MT/day

    Dynamic production timeline

    every date of the month · click a date to inspect · future dates can be marked (scenario)

    Shutdown & capacity recovery simulator

    4 → 0 shutdown days at the selected achievable rate · click a row to apply it as the scenario

    Scenario comparison

    Base · Recovery · Aggressive · current · saved

    Alerts & decision support

    National capacity consolidation

    Σ of sites — each plant-day counted once · click a site to drill down

    Projected surplus / deficit by site · MT

    Spare capacity that may cover a short site

    Product mix & practical constraints

    aggregate MT model · product-level capacity is a reference
    Limitations of the aggregate model: capacity is not interchangeable across products — pellet, mini / micro pellet, crumble and mash run at different TPH; die changes, sequencing, RM availability, warehouse congestion, equipment downtime, rejects and tolling contracts can make volume unavailable when it is needed. The mix-adjusted rate (MTD mix × Cost-by-Form TPH × run hours/day) is offered as a rate basis; a full product-level plan needs a per-product forecast (not in the sources yet).

    Data sources & integrity

    what every KPI is built from

    Baseline plan · site configuration

    approved operating assumptions — saved in this browser, separate from source data and scenarios
    Default (owned plants): Mode B — 4 planned shutdown days = the 1st–4th Sundays of the month (a 5th Sunday is worked). Mode A uses planned operating days directly (e.g. 26 = S&OP basis) — shutdown days are then informational and never subtracted again. Tolling sites default to Mode A with their average production days of the last 3 months. Blank fields use the default / source value.

    Month-on-month performance

    Month-end volume · actual vs demand vs capacity · whisker = downside → upside · % = attainment · ▸ = open month (green = projected remaining)

    Run rate month on month · MT/day · bar colour = pace ÷ demo (green ≥ 90% · amber ≥ 75% · red) · whisker = weakest → best-quarter days

    Cumulative year to date · MT

    Month-end scenario table · management report

    AI insights

    ✦ Smart analysisevery insight: finding · evidence · impact · cause (verified / hypothesis) · action · external evidence

    Action tracker

    Industry intelligence library

    external references used by the insights — source, year, confidence

    📊 Management report — PowerPoint

    editable deck with tables, charts, exceptions and an action plan · Excel data appendix · numbers from this app's own engine
    PERIOD
     
    SITES
    PDF: open the .pptx and choose File → Save as PDF

    Report generator

    uses the global period & site filters · totals reconcile with the dashboard

    Sources & freshness

    every number traces back to one of these

    Validation results

    duplicates · missing columns · implausible values · reconciliation

    Daily ledger vs MR monthly sheet

    Σ daily output = monthly row?

    Order log vs MR input

    batch input (snapshot) vs MR plant input

    Import a CSV (override a source for this session)

    preview · validate · use — does not change the Google Sheet

    Import history

    KPI registry

    formula · numerator · denominator · source · missing-data rule · threshold

    Thresholds

    good / warning boundaries — saved in this browser

    Rated capacity (design TPH)

    used for rated-vs-demonstrated-vs-actual

    Product hierarchy & rules