OPERATION EXCELLENCE COMMAND CENTER
National feedmill operations intelligence · output · run rate · mix · quality · materials · S&OP — click any module to open it
Priority actions
⚡ BIGGEST MOVES
📐 Targets & Settings⟳ Refresh data⬇ Export Excel📄 Reports🤖 Action tracker
KPI tiles
Green = on target · amber = up to 7 % off · red = more than 7 % off (not attained) · ᵃ = no official target, so the target is the plant's own average · 🔥 = days in a row not attained · daily values from the MR daily report; OEE and coal from the weekly sheet; LTI from the safety workbook.
Not attained
KPI detail
daily trend vs target · all plants comparedWeekly matrix (classic view)
the 14-KPI × week grid from the VPI dashboard · click to expand
Failing KPIs — weekly matrix
Targets: Ken's KPI limits (management spec 24 May 2026, plant targets revised 30 May). ᵃ = no official target → the plant's own average of its weeks. Weekly values from the Weekly Operations sheet; daily output = average of production days; MCOS/t = average of the daily cost-by-form sheet.
Cell detail
weekly trend vs target · the plant's scorecard for that weekFailures by KPI
Failures by plant
red cells in the weeks shown⚠ Consistently failing KPIs
red in ≥ 50 % of weeks or 3+ weeks in a row · judged over the weeks shown (running week excluded) · click a row to open itKPI trend watch
Findings
✦ Smart analysisrule-based, quotes its numbersRecommended actions
owner · evidence · add to trackerMonthly output vs commitment & forecast
Plant performance
click a plant to focus · tolling plants markedOutput trend
Output by period
actual · plan · commitment · forecast · variance · attainment — click a row to drill into itPlant × product line
MT · lines add up to total outputPlant × product form
MT · forms add up to Complete Feeds + Mash linePlant run rate & capacity
gross vs net vs equipment · rated vs demonstrated vs actualRun rate trend
Product-form run rate (TPH)
Product-form run rate by plant
MT/h = form volume ÷ form hours (Daily Cost-by-Form) · different forms have different achievable ratesEquipment · pellet-mill lines
output per line · run hours · bottleneck flagOEE (weekly sheet)
Where the hours went
working hours → productive hoursDowntime by category & plant
hours — detail lives in the Reliability Command CenterEfficiency by plant
output per hour / day · change-overs · schedule adherence · capacity lostChange-over trend
Product line mix
% of total outputProduct form mix
% of Complete Feeds + Mash lineForm mix trend
Plant form mix
% of each plant's feed output · TPH beside itPack formats produced
Top feeds produced
Rejection rate trend
Process gain / loss trend
kept separate from rejects · band ±%💧 Smart Moisture SKUs — gain / loss monitor
Production orders (newest first)
By plant
rejects (outright + other = remill) · gain/loss · valueRejection register
Remill re-used in production
order log · remill components issued into new batchesComplaints by category
Complaint trend
Valid vs invalid
Status
Product form
Pick-up vs delivery
Customer type
Bags vs bulk
Corrective action
CCAR issued
By warehouse
valid · invalid · pending · plant code where the warehouse is a plantTop products named
a complaint naming 2 products counts in bothWarehouse × category heat map
click a cell to filter bothFeed age at complaint
Workload by person assigned
closed · open · no statusDays to close
Delivery → complaint
Process compliance by regional manager
% of complaints with a corrective action · CCAR · evidence · click a manager to filterComplaints by sales rep (filed by)
valid · invalid · pendingComplaints by regional manager
blank regional manager = direct managerFindings
✦ Smart analysisrule-based, quotes its numbersRecommended actions
Repeat customers
Open complaints watch-list
Complaint log
Plant × week — variance value
Weekly variance value by plant
Accumulated variance value by plant
Total variance % by plant
Σ variance ÷ Σ (beginning + received) · dashed = approval limits (MACRO 0.5%, LIQUID / GRAINS 0.3%, MICRO 0.2%) · weeks use the KPI sheet % (all categories)RM variance by plant
MR sheet · − = over-usageMonthly trend
net and absolute % of inputComponent variance — planned vs issued
RM mass balance — formula → weigher → bagging, by month
Order log vs plant input & output — by month
Variance flags
data-integrity checks on the order logFeed & formula selector
Run rate — this feed
Composition by nutrient group
% of batch input (issued)Oils & liquids inclusion (kg/MT)
palm oil · molasses · coconut oil by monthFormula as practised
planned vs actual inclusion · kg/MT · variance · monthly drift — read-only; changes go through formulation approvalFormula exceptions & substitutions
components that appear/disappear by month or drift > 2 ptsProcess & pellet quality
order level · liveEvery completed production order from SBO Prod Output Monitoring: run rate, SOV, extraction, rejects, gain/loss and the pellet-mill readings (conditioning, moisture, hardness, fines, amperes). Uses the global period, site and form filters.
Weekly output · run rate · SOV
Hardness vs conditioning temperature
each dot = one pelleting order with both readingsProcess window by plant & form
median and 10th–90th percentile · amber = median outside the guidance bandFeeds — run rate, SOV and pellet quality
top 30 by outputPeople — run-rate index
100 = median of the same plant + form + month (fair across products)Process data recorded
share of pelleting orders with each reading filledOrders outside the process window
Can we trust "issued vs planned"?
share of order lines where issued = planned exactly — then the variance is not measured (issued copied from the plan)Macro liquids — kg per MT of feed
issued ÷ finished-feed batch input · planned in bracketsMonthly inclusion by plant
Unusual consumption alerts
month > ±20 % from the plant's own averageWhy did kg/MT change? — product mix vs formula
Top macro materials
Next-month requirement
Top raw materials per plant
MACRO · MICRO · OIL — MT issued and kg/MT📈 Daily
Week
Daily Output by Plant
MT · per plant · red = below the plant daily targetDaily Output — Stacked
total · by plantCapacity Utilization %
output ÷ demo capacityUnscheduled DT %
daily UDT rate per plantRejection Rate %
remill ÷ outputEnergy — kWh / Ton
daily efficiencyFuel — Liters / Ton
daily fuel efficiencyDaily Fuel Cost
₱ / day · by plantForm Mix — Period Total
pellet · crumble · mash MTDaily MCOS / Ton
₱/MT per plant · MCOS ÷ MR daily outputMfg Cost ₱/MT by Form — Period Avg
Variable vs Fixed Cost
stacked · ₱ / dayForm Share % — Period
production mix by formDaily Detail Log
| Date | Wk | Plant | Planned | Output | Plan % | Cap Util | UDT % | Total DT % | Run Rate | Rej % | kWh/Ton | Li/Ton | Pellet | Crumble | Mash |
|---|
📈 KPI Trends — daily month · latest week · last 7 days, then each KPI day by day
Capacity Util vs Plant Util %
DAILY · two lines · target 85%OEE Trend
DAILY · per plantOutput (MT)
DAILY trend · per-plant daily targetOutright vs Other Rejects %
DAILY · two linesProcess Loss / Gain %
DAILY · ±bandUnscheduled DT per Category (hr)
DAILY · Elec / Mech / PLC / ProcessMCOS Trend (₱/ton)
DAILY · Daily Cost sheet MCOS/tonFuel / Coal Consumption
DAILY trend vs limitPower Consumption kWh/ton
DAILY trend vs limitPlant RR vs Net RR (t/hr)
DAILY · two lines + varianceRM Variance %
DAILY · gross · w/o sacksSafety — Safe Man-Hours & LTI
DAILY · LTI target 0Command-center additions plan attainment heat map & exceptions (not in the VPI dashboard tab)
Daily output vs plan
Daily rejection & gain/loss
Daily run rate & downtime %
Plan attainment heat map
plant × day · click a cell to open that dayDaily exceptions
days outside the thresholds in Settings, with the source numbersWeekly Pulse
View week
Scorecard
Complete Feeds · cap util · OEE · UDT per plantWeekly KPI Summary
period totals & averagesWeekly Output MT
all plants or selected siteWeekly DT Rate %
week by weekCapacity Utilization %
weekly trend by plantRun Rate t/hr
self-operated plantsFull Weekly KPI Detail — All Sites × All Metrics
rows = KPIs · columns = weeks · scroll rightWeekly Pull-Out Report
📈 KPI Trends — weekly month · latest week · last 7 days, then each KPI week by week
Capacity Util vs Plant Util %
WEEKLY · two lines · target 85%OEE Trend
WEEKLY · per plantOutput (MT)
WEEKLY trend · target = daily × 6Outright vs Other Rejects %
WEEKLY · two linesProcess Loss / Gain %
WEEKLY · ±bandUnscheduled DT per Category (hr)
WEEKLY · Elec / Mech / PLC / ProcessMCOS Trend (₱/ton)
WEEKLY · mfg cost per tonFuel / Coal Consumption
WEEKLY trend vs limitPower Consumption kWh/ton
WEEKLY trend vs limitPlant RR vs Net RR (t/hr)
WEEKLY · two lines + varianceRM Variance %
MONTHLY · gross · w/o sacks (source is monthly)Safety — Safe Man-Hours & LTI
WEEKLY · LTI target 0Command-center additions ISO-week table, ranking & recurring exceptions (not in the VPI dashboard tab)
Weekly KPI table
Weekly output · per production day
normalises for working daysWeekly quality & run rate
Top & bottom plant each week
plan attainment · tolling excludedRecurring exceptions
KPI failing in ≥ 3 of the last 4 complete weeksPerformance Radar
Self-operated · Normalized 0–10DT Rate Ranking
Total DT% — lower is betterFull Performance Summary — 2026
| Plant | Output | Cap Util | Avg UDT | Avg DT% | Net t/hr | Avg Rej% | kWh/ton | ₱/ton | Total ₱ | RM Var% | Rating |
|---|
KPI Targets vs Actuals — Heat Map
Per plant · vs revised 2026-05-30 targets · green within / amber near / red beyond
Sales Forecast — Loading...
Monthly Sales Forecast — by Area
kg · Total Plant Output in MT · sales sheetMonthly Sales Forecast — by Warehouse
Per-warehouse coverage & gap · region subtotalsWeekly Pull-Out — by Area
kg📦 Pull-Out by SKU — Region × Month
SKU × volume (tons)Command-center additions — forecast accuracy, SKU forecast tracker and pack formats (not in the VPI dashboard tab).
Forecast accuracy (production vs S&OP forecast)
SKU forecast vs MTD pull-out
from the regional SKU MTD sheetsPull-out by pack format & month
MT · SKU pull-out sheetSales & Operation Planning
📋 Sales & Operation Planning
Per-plant S&OP review · forecast vs commitment · highlights, issues & actions
Output vs Forecast vs Commitment
Capacity Utilization Rate
vs Demo Capacity · %Detailed Performance Summary
Full Metric BreakdownSite Utilization Ranking
Rejection Breakdown
Outright vs Other · %Monthly Highlights · Issues · Actions
✓ Highlights
! Issues
◎ Actions
Executive S&OP Summary
✦ auto-composedauto-composed narrative · selected plantCommand-center additions — month-end landing, scenario planner, region balance, allocation proposals and approval log (not in the VPI dashboard tab).
Planning month & scenario
a proposal, not a confirmed commitmentSupply vs demand by plant
Region balance
plants in a region can cover each otherProposed allocation
move shortfall to same-region plants with spare demonstrated capacityForecast · commitment · actual by month
Plan approval log
saved in this browser (Phase 1)Capacity & Sales Alignment · live capacity simulator
Live scenario controls
what-if only · source data never changesMonth-end expected volume projection
MTD actual + projected remaining = expected month-end · red line = sales forecastDaily run-rate trend
actual vs required vs selected achievable rate · MT/dayDynamic production timeline
every date of the month · click a date to inspect · future dates can be marked (scenario)Shutdown & capacity recovery simulator
4 → 0 shutdown days at the selected achievable rate · click a row to apply it as the scenarioScenario comparison
Base · Recovery · Aggressive · current · savedAlerts & decision support
National capacity consolidation
Σ of sites — each plant-day counted once · click a site to drill downProjected surplus / deficit by site · MT
Spare capacity that may cover a short site
Product mix & practical constraints
aggregate MT model · product-level capacity is a referenceLimitations of the aggregate model: capacity is not interchangeable across products — pellet, mini / micro pellet, crumble and mash run at different TPH; die changes, sequencing, RM availability, warehouse congestion, equipment downtime, rejects and tolling contracts can make volume unavailable when it is needed. The mix-adjusted rate (MTD mix × Cost-by-Form TPH × run hours/day) is offered as a rate basis; a full product-level plan needs a per-product forecast (not in the sources yet).
Data sources & integrity
what every KPI is built fromBaseline plan · site configuration
approved operating assumptions — saved in this browser, separate from source data and scenariosDefault (owned plants): Mode B — 4 planned shutdown days = the 1st–4th Sundays of the month (a 5th Sunday is worked). Mode A uses planned operating days directly (e.g. 26 = S&OP basis) — shutdown days are then informational and never subtracted again. Tolling sites default to Mode A with their average production days of the last 3 months. Blank fields use the default / source value.
Month-on-month performance
Month-end volume · actual vs demand vs capacity · whisker = downside → upside · % = attainment · ▸ = open month (green = projected remaining)
Run rate month on month · MT/day · bar colour = pace ÷ demo (green ≥ 90% · amber ≥ 75% · red) · whisker = weakest → best-quarter days
Cumulative year to date · MT
Month-end scenario table · management report
AI insights
✦ Smart analysisevery insight: finding · evidence · impact · cause (verified / hypothesis) · action · external evidenceAction tracker
Industry intelligence library
external references used by the insights — source, year, confidence📊 Management report — PowerPoint
editable deck with tables, charts, exceptions and an action plan · Excel data appendix · numbers from this app's own enginePERIOD
SITES
PDF: open the .pptx and choose File → Save as PDF